CDRC Claim, Dispute, Resolution and Consultancy

Projects

Where we are working now.

Road upgrades, hydropower development, airport improvements, tunnelling and water conveyance — each with its own technical and contractual demands. These are some of the engagements currently running.

No. Project Scale Sector
01Upper Trishuli 1 Hydroelectric Project216 MWHydropower
02Upper Trishuli 3A Hydroelectric Project60 MWHydropower
03Kathmandu–Terai Expressway (Fast Track)70.977 kmRoads · Bridges · Tunnels
04Tanahu Hydropower Project140 MWHydropower
05Bheri Babai Diversion Multipurpose Project46.8 MWTunnelling · Diversion
06Bhotekoshi Hydroelectric Project102 MWHydropower
07Tamakoshi V Hydropower Project99.8 MWHydropower
08Expansion of Tribhuvan International AirportKathmanduAviation
09Biratnagar Airport ExpansionBiratnagarAviation
10Mugling–Pokhara Road, package 181 kmRoads
11Narayanghat–Butwal Road Expansion ProjectExpansionRoads
12Siddhababa Tunnel ProjectTunnelTunnelling
13Suryabinayak–Dhulikhel RoadUpgradeRoads
14Sunkoshi Marin DiversionDiversionTunnelling
15Bheri PumpingPumpingWater
16KUKL build and distribution networkNetworkWater supply
17Melamchi Water Supply ProjectSindhupalchokWater supply
18Construction of DharaharaKathmanduBuilding

Scale figures are as stated in the 2026 company profile. Engagements are ongoing and this list is a selection rather than the complete register.

Water discharging through the gates of a dam spillway
Spillway discharge, hydropower scheme

Sectors we work across.

HydropowerRoads and highwaysBridges Water conveyance tunnelsAirportsTunnelling Water supplyTransmission linesDistribution networks BuildingsLarge-scale public works

From remote Himalayan hydropower sites to dense urban projects inside the Kathmandu valley, including work with organisations engaged on internationally funded projects.

Who we act for